1999-2000
Annual Report
SUMMARY
OF SIGNIFICANT ACCOMPLISHMENTS FOR 99/00
[Department-Wide]
[Protective Services]
[Access & Auxiliary Services] [Custodial
Services]
Campus Services expanded its' scope of operations significantly during
1999/00 as the auxiliary services functions were successfully integrated
into the department. In addition to the specific goals for 99/00,
several other significant accomplishments were realized. These included
the following:
- The successful recruitment
of two key management positions; Asst. Director for Patrol Operation
(Brian Hurd) and the Asst. Director for Food Service (Andrew Herberger),
- A major renovation
of Leutner Commons was planned and implemented as a fast track,
summer project.
- Two important consulting
studies were initiated. These are the retail needs study and the
development of a food service master plan.
- The Campus Services
administrative offices were temporarily relocated from CASC to
Sigma Chi. Plans for the renovation of the NCO, which will serve
as the permanent location for the administrative offices, were
finalized.
Following is a status report on the accomplishments, which relate
directly to specific goals for 99/00.
Department-Wide
- Goal: Develop and
implement contingency plan to address potential Y2K problems for
all critical systems.
Status: Contingency plan was implemented. No systems, critical
or otherwise in Campus Services were adversely impacted by Y2K.
- Goal: In conjunction
with Facilities & Operations, update and expand the existing emergency
response plan. Develop a plan for a backup dispatch center at
the NCO.
Status: Current emergency response plan has been updated which
includes provision for an Emergency Response Command Center. New
plan will be introduced to the campus in the coming year. Backup
dispatch is being incorporated in NCO renovation.
- Goal: Fully integrate
the MIS support function and the systems tech support function
to improve efficiency and better maintain systems throughout Facilities
& Operations.
Status: Goal was modified due to organizational changes. MIS position
and systems tech functions were successfully integrated within
Campus Services.
- Goal: Support the
effort to integrate the financial management and budgetary processes
throughout Facilities & Operations in order to improve efficiency
and accountability.
Status: Campus Services' internal financial management processes
were streamlined in order to support the reporting structure within
Facilities & Operations.
Protective Services
Security Operations
- Goal: Explore possibility
of sharing resources with UCPD and/or other institutions in the
delivery of security services in order to generate cost savings
and improve efficiency.
Status: Initiated comprehensive review of feasibility of operating
joint dispatch function with UCPD. While no real cost savings
would be generated, there is potential for a number of operational
improvements. Final report will be completed by Sept. 1, 2000.
- Goal: Continue
to maintain a low crime rate on campus through proactive security
measures.
Status: Serious crimes against persons continue to be maintained
at extremely low rate. Significant increase in auto theft related
crime required considerable attention. Arrests of several different
suspects over the course of the year helped to control this problem.
Protective Systems
- Goal: Continue
to implement building key recoring program.
Status: Prioritization complete. System design for several buildings
in progress.
- Goal: Develop and
implement plan to change all elevator fire service locks to common
key.
Status: Goal revised due to prohibitive cost. Will install lock
boxes at elevator locations containing fire service key.
- Goal: Complete
the RFP process for purchase of new campus wide card access system
and select new system.
Status: RFP has been developed and issued. A new system will be
selected by Sept.1.
Parking Operations
and Maintenance
- Goal: Implement
multi-year facility improvement plan in order to address deferred
maintenance needs.
Status: Parking capital maintenance plan has been implemented.
Current significant projects include HSC podium (lot 55), U. West
Garage cement restoration and waterproofing. In addition, numerous
other enhancements to both garages and surface lots have been
completed. Program is fully funded through parking revenues.
Access & Auxiliary Services
Access/Auxiliary Counter Operations
- Goal: Continue
to study options for the development of on-line parking permit
registration.
Status: On-line parking registration system has been implemented.
On-line sales will be supported during 00/01.
- Goal: Complete
re-issuance of new ID cards to the campus community.
Status: Issuance of new cards has been completed.
Food Service/ Vending
- Goal: Investigate
feasibility of adding an automated value station at Thwing for
students to add points to their ID cards. If determined to be
feasible, complete installation.
Status: Automated value station determined non-feasible at Thwing,
however, planning is in progress to add a station in the northern
housing complex.
- Goal: Complete
multi-year facility improvement plan for all dining facilities.
Status: Multi-year financial plan has been completed. Leutner
Commons renovation is current major renovation. Food service consultant
will assist in further development of renovation and facilities
strategy.
- Goal: Participate
in the planning for the renovation of both the Bookstore and the
dining facility within Thwing Center in order to capitalize on
this opportunity to improve auxiliary operations.
Status: Campus Services has been directly involved in the student
center planning relative to the bookstore and dining facilities.
Process is ongoing. We have retained consultants to conduct both
a retail study and a food service master plan, which will support
the student union planning process.
- Goal: Review options
and upgrade the Faculty Dining Room's physical appearance and
menu offerings in order to improve the overall dining experience
at this facility.
Status: Faculty & Staff dining room was upgraded to include waiter
service and expanded menu options. Changes have been well received
by the campus community.
- Goal: Complete
RFP for the operation of coffee kiosks and install kiosks at selected
sites on campus.
Status: RFP process was completed and coffee kiosks have been
successfully installed at both Baker and BRB.
Bookstore
- Goal: Insure that
all expectations and obligations under the new contract with Barnes
& Noble are delivered and that the quality of service is excellent
during their first year of operation.
Status: The transition to Barnes & Noble has been very smooth
and excellent customer service has been maintained.
Custodial Services
Campus Wide
- Goal: Work with
Purchasing to implement a master supply contract for common custodial
supply items.
Status: RFP process completed. Proposals have been evaluated and
master contract should be awarded prior to 8/1/2000. Considerable
cost savings should be realized as well as an improved distribution
process.
Main Campus
- Goal: Improve overall
consistency in delivery of custodial services throughout the in-house
program in order to eliminate recurrent problems. Study the campus
day staffing program and identify methods to improve response
and overall service.
Status: In progress. Continue to review operations and cleaning
deployment in order to improve consistency and quality.
Housing
- Goal: Review the
consultant's recommendations for improvement of the Housing cleaning
program and implement as appropriate.
Status: Based on consultant's recommendation, an RFP was issued
and Crothall Education Services was selected to manage the Housing
custodial program. Crothall began the contract on May 1 and has
made significant progress since that time.
HSC
- Goal: Complete
the conversion of the BioHaz waste pick-up program to Janco Services
and utilize in-house labor savings to support expansion of the
recycling program.
Status: Conversion has been successfully completed.
- Goal: Continue
to aggressively manage the Janco contract at the HSC complex in
order to improve the overall level of cleaning at these facilities.
Status: Based on negative feedback form Med School, Janco's contract
was reduced and Crothall was awarded contract for Med School only.
Janco was retained for balance of HSC buildings and satisfaction
is good. Crothall's transition was effective July 1, 2000.
|